Call Us08045478465
AddressMumbai - 400063, Maharashtra, India
Gas Odorization System
Gas Odorization System

Gas Odorization System

Price 340000 INR/ Piece

MOQ : 1 Piece

Gas Odorization System Specification

  • Product Type
  • Gas Odorizing System
  • General Use
  • Gas Odorization
  • Material
  • Stainless Steel
  • Automatic
  • Yes
  • Voltage
  • 240V Volt (v)
  • Feature
  • High Performance, Low Maintenance Cost, Low Noise, Lower Energy Consumption, High Efficiency
  • Color
  • SS 304
 

Gas Odorization System Trade Information

  • Minimum Order Quantity
  • 1 Piece
  • Delivery Time
  • 7-10 Days
 

About Gas Odorization System


SV GAS SOLUTIONS PVT LTD
TECHNICAL SPECIFICATION FOR LPG ODORIZATION SKID
OPERATOION CONDITION
Max. Gas Odorant Injection (2.3 lt/h) for each pneumatic pump
No of Streams Single with two pumps ( 1 working + 1 stansby)
Pump actuating pressure 2 bar
Working Temperature -15C to +60C
Automatic Mode / Manual mode Flow Data signal (pulse or 4-20mA) from flow meter
Gas Odorant EM
ODORIZATION SYSTEM DESCRIPTION
SS316 Pnuematic Pump Two Pumps Pneumatically operated Positive Displacement : 1 working + 1 stansby
SS 304 Tank 500 Lit
Pump Panel IP-65
Electronic Control Panel Siemens PLC-HMI (Hazardous area- Zone 1) ATEX
Control Panel Ex Proof ATEX
Modbus TCP - For system standart control; RS 485 connection
Protection class IP 65 (Min) / NEMA4
Display Siemens HMI
According to NG Flow Data Pulse or 4-20mA- from the NG Flow Computer
Regulator Two number High Pressure
Selonoid valves Ex proof ATEX
SS 304 Filter For odorant line
Flow Transmeter Measurment device Verometer- ATEX
ODORIZATION TANK
500 ltr Horizontal Storage Tank. According to ASME SEC VIII DIV 1. Warning & safety Instructions.
SS 304- Magnetic Level Gauge For visual level measurement
Level transmitter Level Transmitter with gauge / level Switch and SS flame arresters
CALIBRATION COLUMN
Inbuilt Glass calibration column Pump stroke calibration and flow transmeter (verometer) calibration
SPILL PAN
SS304 Spill pan Material Capacity 110%, odorant storage tank, pump cabinet on the spill pan
SOLAR PANEL OPTIONAL Solar will be the primary power and secondry power shall be electrical.
Tell us about your requirement
product

Price:

Quantity
Select Unit

  • 50
  • 100
  • 200
  • 250
  • 500
  • 1000+
Additional detail
Mobile number

Email



Back to top